About the project
Project details | |
---|---|
Size | 3,800 SF | Location | Joliet, IL | Firm Role | Planning | SD | DD | CD | CA | Cost | $629,346 | Program | 1 Cath Lab | 1 EP Lab | 9 Holding Bays |
The renovation of the Cardiac Cath Lab has been divided into 4 phases. Phase I included the new Cath Lab room (600 SF), an expanded shared control room between Cath and EP Lab rooms (160 SF), and new Recovery and OP holding rooms (600 SF), with 4 holding bays and 1 new nurse station. Phase II included the renovated EP Lab (610 SF) as well as new Recovery and OP holding rooms (880 SF), with 5 holding bays and 1 new nurse station. Phase III involved the removal of the staff work area and 1 recovery bed to provide access for connection to the new bed tower. Phase IV included the renovated Cath Lab and Control Room (860 SF).